The Custodian Newspaper Online
No Result
View All Result
Sunday, March 15, 2026
  • Home
  • News
  • Politics
  • Business
  • Opinion
  • Showbiz
  • Health
  • Sport
  • World
  • eStore
The Custodian Newspaper Online
  • Home
  • News
  • Politics
  • Business
  • Opinion
  • Showbiz
  • Health
  • Sport
  • World
  • eStore
No Result
View All Result
The Custodian Newspaper Online
No Result
View All Result
Home Featured

Prez C’ssions 13MW Kaleo Solar Power Project

by John Kekeli
August 24, 2022
in Featured, News
0
Prez C’ssions 13MW Kaleo Solar Power Project
152
SHARES
1.9k
VIEWS
Share on FacebookShare on Twitter

President Nana Addo Dankwa Akufo-Addo has commissioned the Volta River Authority’s 13MW Solar Power Project in Kaleo to help improve energy supply in the Upper West Region.

He pointed out that the completion of the project whose sod he cut in February 2020, is further testament to the fact that he delivers what he promises.

President Akufo-Addo noted that the Project, which is the first phase of what will, eventually, be a 28MW plant at Kaleo.
He reiterated government’s commitment to diversify further the country’s energy generation portfolio, and increasing the nation’s renewable energy generation mix.

Speaking at the ceremony in Kaleo, in the Upper West Region, yesterday, President Akufo-Addo indicated that the Kaleo Solar Plant, along with on-going interventions in the area of energy efficiency.

These include the use of natural gas for thermal generation, adoption of cleaner cooking solutions, decarbonisation of oil production that will help Ghana accelerate the attainment of her Nationally Determined Contributions, as presented at COP26 in Glasgow, in the United Kingdom.
“The Akufo-Addo Government has invested heavily in the electricity transmission network, which will enable us evacuate more renewable energy through the national grid, to support the extension of electricity to all parts of Ghana. For this reason, Kaleo has a dedicated transmission line that evacuates power from the current and future solar capacity at Kaleo to the GRIDCo substation at Wa.

“At peak sun hours, the Kaleo and Lawra plants can meet the entire load at Wa and its environs. This can make Wa the greenest city in Ghana. The completion of the Kaleo Solar Power Plant is consistent with Ghana’s Nationally Determined Contributions to addressing the effects of climate change,” he stated.

Since 1961, when the nation started commercial production of electricity, almost all the generation assets, with the exception of the Bui Hydro power plant, have been located in the middle and southern parts of the country.

As a result of this, President Akufo-Addo hinted that government has taken it upon itself, “as part of our development trajectory, to bring some of these sources closer to the North, thereby opening up additional opportunities in our regional development journey”.

The Volta River Authority, he said, has been one of our main vehicles for improving access to electricity and related developments, particularly in the northern parts of the country.

“It completed the first solar plant of 2.5 megawatts in Navrongo way back in 2013. Under this Government, we have successfully completed a 6.5 megawatts solar plant in Lawra, which I personally commissioned. Today, we are here signing-off on this thirteen-megawatt (13MW) addition,” he said

President Akufo-Addo also announced that the construction of another 15MW plant has already begun, and funding has been duly secured from the German Development Bank (KFW), and is expected to be completed within one year.

In addition to the Kaleo Project providing several benefits, including, increasing the geographic spread of power generation assets; improving the resilience of the national power system; stabilising voltage levels and reliability of power supply in the Upper West Region; and, ultimately, reducing the nation’s carbon footprint, the President stated that the construction of the new 15MW plant is employing some 130 people during the construction phase.

“I am glad to note that most of the workers used for some ninety-five percent (95%) of the construction and operational phase are from the nearby communities. The project will serve as a tourism boost for the Kaleo community, and as a destination for educational and technological field trips in the Region. It will contribute to promoting the advancement of science education, engineering and technological activities in this area, and broaden the career outlook of our young people,” he added.

With this project in the community, President Akufo-Addo was expectant that “corporate social responsibility programmes for Kaleo and neighbouring communities will be enhanced by the appropriate authorities in many forms, including, but not limited to, the rehabilitation of the Kaleo D/A Primary School and the provision of furniture and other critical amenities for the school.”

Tags: Kaleo Solar Power
  • Latest
  • Trending
Ofori-Atta residency

Ofori-Atta moves to secure U.S permanent residency

March 15, 2026
Utility electricity water

Utility rates fall April 1: Electricity down 4.81%, water down 3.06%

March 14, 2026
Domelevo audit report

Domelevo calls for action against officials in GH¢68bn audit report

March 14, 2026
March public holidays

Govt declares March 20 and 23 as public holidays

March 14, 2026
Headmaster Agbana Dzosec

Agbana slams Lobbyists trying to replace DZOSEC Headmaster

January 29, 2026
Dzosec Arrest Headmaster

DZOSEC: Audit Report Calls for Arrest of Former Headmaster

August 23, 2025
Newspaper Frontpages – Thursday, 29th January, 2026

Newspaper Frontpages – Thursday, 29th January, 2026

January 29, 2026
Newspaper Frontpages – Monday, 9th February, 2026

Newspaper Frontpages – Monday, 9th February, 2026

February 9, 2026

The CustodianGh Online’s vision is to become the most preferred go-to news brand in Ghana.

Contact Us

thecustodiangh@gmail.com

Popular Categories

  • News
  • Business
  • Politics
  • Sport
  • Arts & Showbiz
  • Tech

Archives

© 2025 The CustodianGh Online - All rights reserved.

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you consent to the use of ALL the cookies.
Do not sell my personal information.
Cookie SettingsAccept
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Opinion
  • Showbiz
  • Health
  • Sport
  • eStore

© 2025 The CustodianGh Online - All rights reserved.