The Custodian Newspaper Online
No Result
View All Result
Wednesday, November 18, 2026
  • Home
  • News
  • Politics
  • Business
  • Opinion
  • Showbiz
  • Health
  • Sport
  • World
  • eStore
The Custodian Newspaper Online
  • Home
  • News
  • Politics
  • Business
  • Opinion
  • Showbiz
  • Health
  • Sport
  • World
  • eStore
No Result
View All Result
The Custodian Newspaper Online
No Result
View All Result
Home Featured

4-Tier Suame Interchange Project Begins

by John Kekeli
October 19, 2022
in Featured, News
0
4-Tier Suame Interchange Project Begins
153
SHARES
1.9k
VIEWS
Share on FacebookShare on Twitter

President Nana Addo Dankwa Akufo-Addo has cut the sod for the commencement of construction of a 4-tier interchange at Suame, in fulfillment of a pledge he made during his tour of the Ashanti Region last year.

According to him, “the Suame Interchange will be the first 4-tier interchange in the Ashanti Region, and the second in Ghana, after the Pokuase Interchange which I commissioned on 9th July 2021.”

President Akufo-Addo stated that, once completed, it will address the perennial congestion experienced around the Suame Roundabout, and improve urban mobility within the Greater Kumasi Metropolitan Area.

He indicated that the Suame Interchange will consist of a 4-Tier Interchange at the current Suame Roudabout; an overpass at the Abrepo Junction; an overpass at Krofuom Junction; an overpass at Anomangye Junction; an overpass at Magazine New Road Junction; and an overpass at Abusuakruwa Junction.

The construction of the Suame Interchange will be undertaken by M/S Grupo Dizmar of Spain and Rango Construction Ltd a Ghanaian Company.

The complementary road component will be undertaken wholly by the Ghanaian Firm, Rango Construction Company Ltd, with supervision of the entire project being the responsibility of the Ministry of Roads and Highways, through the Department of Urban Roads.

President Akufo-Addo charged the contractors and the Ministry of Roads and Highways to help ensure the country gets value for money, as well as ensure strict adherence to completion dates.

Ashanti Region Roads

Apart from the Suame Interchange, the President indicated that Government is tackling critical road projects throughout the country in a holistic manner, so that every part of Ghana gets quality, all weather roads.

“In the Ashanti Region alone, the Akufo-Addo Government has completed asphalt overlay of two hundred and ninety-five kilometres (295kms) of roads since 2017. Some of the beneficiary areas include Kumasi Metropolitan Assembly, that is in Subin Nhyiaeso and Bantama, Asokwa, Oforikrom, Kwadaso, Suame, Old Tafo, Asokore Mampong, Bekwai, Obuasi, Ejisu, Juaben, Sekyere East (Effiduase), Asante Mampong and Atwima Nwabiagya South,” he said.

Again, President Akufo-Addo stated that Government has completed the construction of one hundred kilometres (100km) of local roads in Kumasi, which was undertaken by M/S Contracta, with the beneficiary assemblies being Kumasi Metropolitan, Asokwa, Kwadaso, Oforikrom. Suame and Tafo Pakrono.

In addition to the one hundred kilometres (100kms) of local roads, the Department of Urban Roads has completed another seventy-five kilometres (75kms) of town roads in Ashanti, including Bekwai Town roads, Kwamo Town Roads, Manhyia Roads (Buokrom) and Ejisu/Kwaso Town Roads.

“The Department of Feeder Roads has also completed the upgrading of sixty-eight kilometres (68kms) of selected feeder roads in the Ashanti and Western Regions, a project which was undertaken by M/S Sinohydro Corporation,” he stated.

President Akufo-Addo noted that, in addition to the completed ones, work is ongoing on the Kumasi Roads and Drainage Extension Project, which is 97% complete.

The works involved in this project, he said, include the upgrading of the Lake Road into a dual carriageway from the Coca Cola Bottling Plant to Dompoase (3.5km), and the lining of the Sissai Stream for 2km.

“The construction of a modern terminal at Dompoase, which is part of the project, has been completed and commissioned. It is expected that the entire project would be completed and commissioned by the end of the year. The works are being undertaken by M/S China Henan International Corporation- CHICO and funded by the Agence Française de Développement (AFD) of France,” he said.

The Construction of the Kumasi Inner City Roads, which involves the rehabilitation of another one hundred kilometres (100kms) of local roads in Kumasi by M/S Sino Hydro Ltd is ongoing, together with the emergency rehabilitation of the twelve-kilometre (12km) Atimatim-Maase-Aboabogya road.

Additionally, there is rge upgrading of the forty-nine-kilometre (49km) Asankare-Krofa-Juansa Road and Krofa-Brantuokrom-Magyeda road, as well the upgrading of 40.3-kilometre Amantema Junction-Wiawso-Senkye Road, and the reconstruction of the thirty-kilometre (30km) Anwiankwanta-Obuasi Road, which is ninety percent (90%) complete, and will be completed by the end of 2022.

President Akufo-Addo noted that the upgrading of the thirty-one kilometre (31km) Dechemuoso area roads and asphaltic overlay of Hill Top Roads, which is fifty-seven percent (57%) complete is also ongoing, together with the upgrading of the 8.7 kilometre Kwapia-Wioso Feeder Road, which stands, currently, at fifty-two percent (52%) complete.

  • Latest
  • Trending
Photos: Mahama visits Akufo-Addo at Nima residence

Photos: Mahama visits Akufo-Addo at Nima residence

November 17, 2026
Haruna Iddrisu’s Protégés Beaten in NDC Regional Contest

Haruna Iddrisu’s Protégés Beaten in NDC Regional Contest

November 17, 2026
10 habits that keep you broke on a salary

10 habits that keep you broke on a salary

November 17, 2026
Napaga Tia Sulemana fulfills promise to Saha Naa Educational Fund

Napaga Tia Sulemana fulfills promise to Saha Naa Educational Fund

November 17, 2026
Headmaster Agbana Dzosec

Agbana slams Lobbyists trying to replace DZOSEC Headmaster

January 29, 2026
Dzosec Arrest Headmaster

DZOSEC: Audit Report Calls for Arrest of Former Headmaster

August 23, 2025
Newspaper Frontpages – Thursday, 29th January, 2026

Newspaper Frontpages – Thursday, 29th January, 2026

January 29, 2026
Newspaper Frontpages – Wednesday, 25th February, 2026

Newspaper Frontpages – Wednesday, 25th February, 2026

February 25, 2026

The CustodianGh Online’s vision is to become the most preferred go-to news brand in Ghana.

Contact Us

thecustodiangh@gmail.com

Popular Categories

  • News
  • Business
  • Politics
  • Sport
  • Arts & Showbiz
  • Tech

Archives

© 2025 The CustodianGh Online - All rights reserved.

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you consent to the use of ALL the cookies.
Do not sell my personal information.
Cookie SettingsAccept
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Opinion
  • Showbiz
  • Health
  • Sport
  • eStore

© 2025 The CustodianGh Online - All rights reserved.